7096 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
2022-04-10 |
Sanaag |
laasqoray |
Xubeera |
3.0 |
Somaliland MoWRD |
26/07/2014 |
Xubeera borehole 1 |
— |
10.6745068 |
48.4880989 |
912.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
6000 |
3000 |
— |
5000 |
0.25 |
— |
380.0 |
pvc |
8.0 |
265.0 |
16.0 |
16.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
PVC |
— |
— |
1 |
3 |
yes |
5 |
8.0 |
Submersible Pump |
— |
— |
265.0 |
Hybrid - Solar/Generator |
Perkins |
50.0 |
— |
— |
— |
— |
no |
— |
32.4 |
7.3 |
2430.0 |
1234.0 |
— |
Communal |
yes |
24/06/2015 |
6 |
5 |
yes |
0.02 |
yes |
— |
— |
— |
ACTED |
27/11/2018 |
Replacement of main raising pipes and submersible pump
Solar |
1: Construction of animal water troughs.
2: Construction of elevated water tank.
3: Rehabilitation of storage water tank.
4: Amergency replacement of main raising pipes and submersible pump.
5: Amergency construction of another borehole due water demand.
6: Caretaker room, generator, toilet, and solar power storage( battery)
|
— |
— |
8137 |
— |
Borehole |
Somaliland MoWRD |
2022-04-10 |
Sool |
las_caanood |
Dhummay |
6.5 |
Turkish Government |
10/06/2020 |
Ceel dibir borehole |
— |
8.2719715 |
47.0805151 |
711.0 |
— |
11 |
— |
rural urban |
yes |
— |
Yes |
— |
3000 |
2000 |
200 |
15000 |
0.0 |
— |
460.0 |
pvc |
8.0 |
372.0 |
4.0 |
8.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
16.0 |
Galvanised Steel |
80.0 |
800 |
0 |
3 |
yes |
10 |
4.0 |
Submersible Pump |
Luwara |
18.5 |
372.0 |
Hybrid - Solar/Generator |
KJ power generator |
50.0 |
Photovoltiac module |
390.0 |
good |
The pipelines are very weak there is leakage every inch of the pipes |
no |
— |
37.0 |
7.3 |
1000.0 |
7850.0 |
— |
Communal |
yes |
10/03/2021 |
13 |
0 |
no |
— |
no |
— |
— |
— |
— |
— |
Nil |
Kiosk are destroyed and not working at all. The animal troughs are same size both camel and sheeps get water similartroughd. So it is required to separate them. |
— |
— |
7231 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
2022-04-10 |
Mudug |
galkayo |
Farah geedi |
1.0 |
DIRRCTAID |
09/02/2016 |
ceelfarah geedi |
— |
6.69753 |
47.521045 |
226.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
10000 |
700 |
250 |
2500 |
1.5 |
— |
240.0 |
pvc |
8.0 |
— |
28.0 |
11.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
16.0 |
Galvanised Steel |
160.0 |
200 |
1 |
3 |
yes |
20 |
11.0 |
Submersible Pump |
granfos |
— |
130.0 |
Solar |
— |
— |
gps |
24.0 |
poor |
1. the Motor is stoped
2. the water tank is very small. |
no |
— |
32.8 |
7.7 |
1600.0 |
830.0 |
— |
Communal |
yes |
— |
3 |
2 |
yes |
0.0045 |
yes |
— |
— |
— |
IRC |
solar |
— |
— |
— |
— |
8088 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
2022-04-09 |
Mudug |
galkayo |
Bandiradley |
0.6 |
ICRC |
04/08/1997 |
Tawakal |
— |
6.4833849 |
46.9369419 |
357.0 |
— |
0 |
— |
urban rural |
yes |
— |
Yes |
— |
8000 |
5000 |
— |
5600 |
0.0 |
— |
200.0 |
gi |
9.0 |
— |
18.4 |
17.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
26.0 |
Galvanised Steel |
300.0 |
600 |
1 |
2 |
yes |
3 |
12.0 |
Submersible Pump |
lowara |
— |
170.0 |
Hybrid - Solar/Generator |
eveco |
40.0 |
350 |
24.0 |
— |
not have water tanks |
no |
— |
35.0 |
7.86 |
1256.0 |
879.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
IRC |
solar |
— |
— |
— |
— |
7762 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
2022-04-09 |
Mudug |
galkayo |
Galinsoor |
0.5 |
Community |
08/02/2012 |
ceel Barwaqo |
— |
6.4255093 |
46.7011536 |
359.0 |
— |
0 |
— |
rural urban |
yes |
— |
Yes |
— |
19112 |
20000 |
— |
— |
— |
— |
196.0 |
pvc |
8.0 |
— |
— |
17.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
Galvanised Steel |
128.0 |
1112 |
0 |
1 |
yes |
20 |
22.0 |
Submersible Pump |
lowara |
— |
132.0 |
Hybrid - Solar/Generator |
perkin |
30.0 |
350w |
26.0 |
fair |
1. not have water tanks
2. not have Distribution pipesline |
no |
— |
33.0 |
8.67 |
626.0 |
437.0 |
— |
Communal |
yes |
— |
— |
— |
yes |
0.0015 |
— |
— |
— |
— |
IRC |
solar |
— |
— |
— |
— |
8146 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
2022-04-09 |
Mudug |
galkayo |
Bandiradley |
0.8 |
DIRECTAAID |
05/12/2018 |
Mubarag |
— |
6.4867771 |
46.9541353 |
316.0 |
— |
0 |
— |
rural urban |
yes |
— |
Yes |
— |
1500 |
— |
800 |
80000 |
— |
— |
172.0 |
pvc |
9.0 |
— |
— |
13.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
68.0 |
Galvanised Steel |
150.0 |
30 |
2 |
3 |
yes |
20 |
14.0 |
Submersible Pump |
not specified |
— |
130.0 |
Hybrid - Solar/Generator |
Doutz |
30.0 |
300 |
23.0 |
poor |
1. the soil is rocky , and get pipelines to the HH. |
no |
— |
34.0 |
7.85 |
942.0 |
654.0 |
— |
Communal |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
IRC |
solar and solar |
— |
2020-03-08 |
— |
— |
7973 |
— |
Dug Well |
Puntland Ministry of Energy Minerals and Water |
2022-04-09 |
Sanaag |
laasqoray |
Midigale |
5.0 |
Community_ |
08/09/2010 |
Midigale dug well2 |
— |
10.6892739 |
48.6736626 |
799.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
2520 |
500 |
— |
3000 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
10.0 |
7.0 |
— |
11.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
28.0 |
Galvanised Steel |
700.0 |
— |
4 |
2 |
no |
— |
— |
Submersible Pump |
— |
— |
— |
Hybrid - Solar/Generator |
— |
— |
— |
— |
poor |
Yield is low.
Distributions pipes are rusted.
No sufficient water kiosks in the village.
Distribution pipe lines are disconnected due to the floods. |
no |
— |
32.1 |
7.5 |
1987.0 |
995.0 |
— |
Communal |
yes |
11/05/2000 |
7 |
3 |
no |
— |
no |
— |
— |
— |
Puntland MoEMW |
12/05/2017 |
Placement of distribution pipe lines.
Construction of elevated water tank. |
1: Construction of generator room
2: Digging the deep of the well in order to increase the yield of well.
3: Generator
4: Placement of distribution pipe lines.
5: Rehabilitation of animal water troughs.
5: Rehabilitation of water kiosks.
6: Amergency construction of borehole |
— |
— |
7708 |
— |
Dug Well |
Puntland Ministry of Energy Minerals and Water |
2022-04-09 |
Sanaag |
laasqoray |
Midigale |
0.5 |
ADESO |
01/01/2003 |
Midigale dugwell 1 |
— |
10.6839932 |
48.6763163 |
809.0 |
— |
3 |
— |
urban |
yes |
— |
Yes |
— |
900 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
12.0 |
5.0 |
3.5 |
2.0 |
7.0 |
24.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
PVC |
1500.0 |
60 |
1 |
— |
no |
— |
— |
Submersible Pump |
Luwara |
— |
12.0 |
Solar |
— |
— |
— |
3.0 |
poor |
1:Submersible pump is not functioning properly.
2:And the well needs to be expanded deeply. |
no |
— |
32.1 |
7.5 |
1987.0 |
995.0 |
— |
Communal |
— |
— |
— |
— |
yes |
0.01 |
no |
— |
— |
— |
CARE-Somaliland |
01/01/2017 |
Elevated water tank
Solar
Submersible pump |
1:Immediate change of the submersible pump
2:PVC pipes
3:Digging the well deeply
4:Generator if possible or solar power storage of battery.
|
— |
— |
7438 |
— |
Dug Well |
Puntland Ministry of Energy Minerals and Water |
2022-04-09 |
Bari |
bossaso |
Yalho |
1.5 |
CARE Somalia |
01/01/2014 |
Yalho dhugwell |
— |
10.9206903 |
49.2572814 |
371.0 |
— |
2 |
— |
urban |
yes |
— |
Yes |
— |
1200 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
7.0 |
3.0 |
10.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
12.0 |
Stainless Steel |
1500.0 |
— |
2 |
— |
no |
— |
— |
Submersible Pump |
— |
— |
7.0 |
Generator |
Iveco |
30.0 |
— |
— |
poor |
Pipelines are rusted
Water tank needs roof top |
no |
— |
32.1 |
7.5 |
1137.0 |
566.0 |
— |
Communal |
yes |
01/01/2006 |
4 |
3 |
yes |
0.1 |
— |
— |
— |
— |
CARE Somalia |
01/01/2017 |
Carried out a Rehabilitation of water tank |
Generator
Pipelines
Solar with battery
Kiosks
Filters |
— |
— |
7208 |
— |
Spring |
Puntland Ministry of Energy Minerals and Water |
2022-04-09 |
Bari |
bossaso |
Laag |
0.33 |
Italiano agency |
12/06/2000 |
Laag spring |
— |
11.0384527 |
49.1842985 |
202.0 |
— |
3 |
— |
rural urban |
yes |
— |
Yes |
— |
1800 |
200 |
— |
2000 |
5.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
12.0 |
— |
— |
— |
— |
Concrete/Masonry tank |
12.0 |
Galvanised Steel |
— |
20 |
7 |
— |
yes |
4 |
10.0 |
Submersible Pump |
Lowara |
— |
2.0 |
Hybrid - Solar/Generator |
Perkins |
9.0 |
— |
1.5 |
fair |
No animal troughs.
Water kiosks are not enough to the village. |
no |
— |
32.1 |
7.4 |
948.0 |
474.0 |
— |
Communal |
yes |
09/06/2020 |
4 |
3 |
yes |
0.006 |
yes |
— |
— |
— |
CARE Somalia |
10/09/2020 |
Installation of solar power system.
Construction of elevated water tank. |
1: Increasing of solar panels.
2: Replacement of rusted iron distribution pipes
3: Extra pipes as a safety. |
— |
— |