SWIMS Database :: CCP MoECC
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7096 Borehole Puntland Ministry of Energy Minerals and Water 2022-04-10 Sanaag laasqoray Xubeera 3.0 Somaliland MoWRD 26/07/2014 Xubeera borehole 1 10.6745068 48.4880989 912.0 2 rural urban yes Yes 6000 3000 5000 0.25 380.0 pvc 8.0 265.0 16.0 16.0 Concrete/Masonry tank 25.0 PVC 1 3 yes 5 8.0 Submersible Pump 265.0 Hybrid - Solar/Generator Perkins 50.0 no 32.4 7.3 2430.0 1234.0 Communal yes 24/06/2015 6 5 yes 0.02 yes ACTED 27/11/2018 Replacement of main raising pipes and submersible pump Solar 1: Construction of animal water troughs. 2: Construction of elevated water tank. 3: Rehabilitation of storage water tank. 4: Amergency replacement of main raising pipes and submersible pump. 5: Amergency construction of another borehole due water demand. 6: Caretaker room, generator, toilet, and solar power storage( battery)
8137 Borehole Somaliland MoWRD 2022-04-10 Sool las_caanood Dhummay 6.5 Turkish Government 10/06/2020 Ceel dibir borehole 8.2719715 47.0805151 711.0 11 rural urban yes Yes 3000 2000 200 15000 0.0 460.0 pvc 8.0 372.0 4.0 8.0 0.0 0.0 Concrete/Masonry tank 16.0 Galvanised Steel 80.0 800 0 3 yes 10 4.0 Submersible Pump Luwara 18.5 372.0 Hybrid - Solar/Generator KJ power generator 50.0 Photovoltiac module 390.0 good The pipelines are very weak there is leakage every inch of the pipes no 37.0 7.3 1000.0 7850.0 Communal yes 10/03/2021 13 0 no no Nil Kiosk are destroyed and not working at all. The animal troughs are same size both camel and sheeps get water similartroughd. So it is required to separate them.
7231 Borehole Galmudug Ministry of Energy and Water Resources 2022-04-10 Mudug galkayo Farah geedi 1.0 DIRRCTAID 09/02/2016 ceelfarah geedi 6.69753 47.521045 226.0 0 rural yes Yes 10000 700 250 2500 1.5 240.0 pvc 8.0 28.0 11.0 Concrete/Masonry tank 16.0 Galvanised Steel 160.0 200 1 3 yes 20 11.0 Submersible Pump granfos 130.0 Solar gps 24.0 poor 1. the Motor is stoped 2. the water tank is very small. no 32.8 7.7 1600.0 830.0 Communal yes 3 2 yes 0.0045 yes IRC solar
8088 Borehole Galmudug Ministry of Energy and Water Resources 2022-04-09 Mudug galkayo Bandiradley 0.6 ICRC 04/08/1997 Tawakal 6.4833849 46.9369419 357.0 0 urban rural yes Yes 8000 5000 5600 0.0 200.0 gi 9.0 18.4 17.0 Concrete/Masonry tank 26.0 Galvanised Steel 300.0 600 1 2 yes 3 12.0 Submersible Pump lowara 170.0 Hybrid - Solar/Generator eveco 40.0 350 24.0 not have water tanks no 35.0 7.86 1256.0 879.0 IRC solar
7762 Borehole Galmudug Ministry of Energy and Water Resources 2022-04-09 Mudug galkayo Galinsoor 0.5 Community 08/02/2012 ceel Barwaqo 6.4255093 46.7011536 359.0 0 rural urban yes Yes 19112 20000 196.0 pvc 8.0 17.0 Concrete/Masonry tank 20.0 Galvanised Steel 128.0 1112 0 1 yes 20 22.0 Submersible Pump lowara 132.0 Hybrid - Solar/Generator perkin 30.0 350w 26.0 fair 1. not have water tanks 2. not have Distribution pipesline no 33.0 8.67 626.0 437.0 Communal yes yes 0.0015 IRC solar
8146 Borehole Galmudug Ministry of Energy and Water Resources 2022-04-09 Mudug galkayo Bandiradley 0.8 DIRECTAAID 05/12/2018 Mubarag 6.4867771 46.9541353 316.0 0 rural urban yes Yes 1500 800 80000 172.0 pvc 9.0 13.0 Concrete/Masonry tank 68.0 Galvanised Steel 150.0 30 2 3 yes 20 14.0 Submersible Pump not specified 130.0 Hybrid - Solar/Generator Doutz 30.0 300 23.0 poor 1. the soil is rocky , and get pipelines to the HH. no 34.0 7.85 942.0 654.0 Communal IRC solar and solar 2020-03-08
7973 Dug Well Puntland Ministry of Energy Minerals and Water 2022-04-09 Sanaag laasqoray Midigale 5.0 Community_ 08/09/2010 Midigale dug well2 10.6892739 48.6736626 799.0 2 rural urban yes Yes 2520 500 3000 1.0 10.0 7.0 11.0 Concrete/Masonry tank 28.0 Galvanised Steel 700.0 4 2 no Submersible Pump Hybrid - Solar/Generator poor Yield is low. Distributions pipes are rusted. No sufficient water kiosks in the village. Distribution pipe lines are disconnected due to the floods. no 32.1 7.5 1987.0 995.0 Communal yes 11/05/2000 7 3 no no Puntland MoEMW 12/05/2017 Placement of distribution pipe lines. Construction of elevated water tank. 1: Construction of generator room 2: Digging the deep of the well in order to increase the yield of well. 3: Generator 4: Placement of distribution pipe lines. 5: Rehabilitation of animal water troughs. 5: Rehabilitation of water kiosks. 6: Amergency construction of borehole
7708 Dug Well Puntland Ministry of Energy Minerals and Water 2022-04-09 Sanaag laasqoray Midigale 0.5 ADESO 01/01/2003 Midigale dugwell 1 10.6839932 48.6763163 809.0 3 urban yes Yes 900 12.0 5.0 3.5 2.0 7.0 24.0 Concrete/Masonry tank 25.0 PVC 1500.0 60 1 no Submersible Pump Luwara 12.0 Solar 3.0 poor 1:Submersible pump is not functioning properly. 2:And the well needs to be expanded deeply. no 32.1 7.5 1987.0 995.0 Communal yes 0.01 no CARE-Somaliland 01/01/2017 Elevated water tank Solar Submersible pump 1:Immediate change of the submersible pump 2:PVC pipes 3:Digging the well deeply 4:Generator if possible or solar power storage of battery.
7438 Dug Well Puntland Ministry of Energy Minerals and Water 2022-04-09 Bari bossaso Yalho 1.5 CARE Somalia 01/01/2014 Yalho dhugwell 10.9206903 49.2572814 371.0 2 urban yes Yes 1200 7.0 3.0 10.0 1.0 Concrete/Masonry tank 12.0 Stainless Steel 1500.0 2 no Submersible Pump 7.0 Generator Iveco 30.0 poor Pipelines are rusted Water tank needs roof top no 32.1 7.5 1137.0 566.0 Communal yes 01/01/2006 4 3 yes 0.1 CARE Somalia 01/01/2017 Carried out a Rehabilitation of water tank Generator Pipelines Solar with battery Kiosks Filters
7208 Spring Puntland Ministry of Energy Minerals and Water 2022-04-09 Bari bossaso Laag 0.33 Italiano agency 12/06/2000 Laag spring 11.0384527 49.1842985 202.0 3 rural urban yes Yes 1800 200 2000 5.0 12.0 Concrete/Masonry tank 12.0 Galvanised Steel 20 7 yes 4 10.0 Submersible Pump Lowara 2.0 Hybrid - Solar/Generator Perkins 9.0 1.5 fair No animal troughs. Water kiosks are not enough to the village. no 32.1 7.4 948.0 474.0 Communal yes 09/06/2020 4 3 yes 0.006 yes CARE Somalia 10/09/2020 Installation of solar power system. Construction of elevated water tank. 1: Increasing of solar panels. 2: Replacement of rusted iron distribution pipes 3: Extra pipes as a safety.