8323 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
2022-03-31 |
Galgaduud |
cabudwaaq |
laandheer |
0.0 |
landheer |
31/03/2016 |
landheer |
— |
6.0900693 |
46.192594 |
346.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
4500 |
1000 |
— |
18000 |
— |
— |
133.0 |
pvc |
8.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
40.0 |
Galvanised Steel |
128.0 |
25 |
1 |
2 |
yes |
5 |
10.0 |
Submersible Pump |
pump stopted function |
— |
104.0 |
Hybrid - Solar/Generator |
Doutz |
32.0 |
300 |
12.0 |
poor |
the pump stoped |
no |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
7304 |
— |
Borehole |
Somaliland MoWRD |
2022-03-31 |
Awdal |
lughaye |
Karuure |
0.2 |
Kuwait Government |
27/07/2019 |
Karuure 2 |
— |
10.7517602 |
43.5917938 |
68.0 |
— |
0 |
— |
rural urban |
yes |
— |
Yes |
— |
7000 |
2000 |
0 |
10000 |
0.0 |
— |
115.0 |
gi |
8.0 |
85.0 |
8.0 |
17.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
288.0 |
Galvanised Steel |
2000.0 |
200 |
3 |
4 |
no |
— |
— |
Submersible Pump |
Grundfoz |
7.5 |
95.0 |
Hybrid - Solar/Generator |
Perkins |
45.0 |
DS572390M |
3240.0 |
fair |
Ok |
no |
— |
33.0 |
7.17 |
3520.0 |
2520.0 |
— |
Communal |
no |
— |
— |
— |
yes |
0.05 |
yes |
— |
— |
— |
SCI |
27/07/2020 |
Solar instalation |
Construction of animal troughs, new tank, solar replacement, pump, generator |
— |
— |
7383 |
— |
Borehole |
FGS Ministry of Energy and Water Resources |
2022-03-31 |
Lower Juba |
kismayo |
Caafi celasha |
15.0 |
— |
29/06/2015 |
Lixda cell caafi |
— |
-0.338723 |
42.5360932 |
13.0 |
— |
6 |
— |
rural urban |
yes |
— |
No |
Three to five month because of low presuure and water became hard |
50000 |
0 |
0 |
0 |
0.0 |
— |
80.0 |
pvc |
— |
35.0 |
33.0 |
24.0 |
25.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
200.0 |
PVC |
15.0 |
8500 |
29 |
0 |
yes |
30 |
— |
Submersible Pump |
— |
— |
30.0 |
Solar |
— |
— |
— |
300.0 |
good |
Good system |
no |
— |
— |
— |
— |
— |
— |
Private/Individual |
— |
— |
— |
— |
yes |
1.0 |
no |
— |
— |
— |
Caafi comlpany |
9-Dec-20 |
Reh in general all the time |
Pump, pipe changes |
— |
— |
7763 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
2022-03-31 |
Galgaduud |
cabudwaaq |
1 luuliyo |
3.0 |
community |
17/03/1977 |
Roob da ay |
— |
6.2470517 |
46.2194633 |
388.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
3000 |
150 |
— |
34000 |
— |
— |
120.0 |
pvc |
8.0 |
— |
40.0 |
20.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
40.0 |
Galvanised Steel |
68.0 |
1800 |
5 |
2 |
yes |
4 |
10.0 |
Submersible Pump |
franglin |
— |
96.0 |
Hybrid - Solar/Generator |
perkin |
32.0 |
300 |
16.0 |
poor |
1. small water tank
2. small pipelines |
no |
— |
— |
— |
— |
— |
— |
Communal |
yes |
— |
3 |
2 |
yes |
0.0015 |
— |
— |
— |
— |
— |
pump and pipes |
— |
— |
— |
— |
7299 |
— |
Borehole |
FGS Ministry of Energy and Water Resources |
2022-03-31 |
Lower Shabelle |
wanla_weyn |
Fulaay |
12.0 |
United Arab Emirates |
01/01/2014 |
Fulaay water supply |
— |
2.5892033 |
44.7926717 |
43.0 |
— |
0 |
— |
urban |
no |
6 |
No |
2021 dor the reason of civil war in wanle weyn |
5000 |
— |
— |
— |
— |
— |
120.0 |
pvc |
10.0 |
80.0 |
18.0 |
24.0 |
10.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
60.0 |
PVC |
1600.0 |
1000 |
1 |
2 |
yes |
10 |
30.0 |
Submersible Pump |
— |
18.0 |
10.0 |
Generator |
Gancava China |
20.0 |
— |
— |
poor |
The water supply system stopped due the conflict of civil war |
yes |
Good |
0.0 |
— |
— |
— |
— |
Communal |
yes |
23-Feb-15 |
6 |
1 |
yes |
0.02 |
yes |
— |
— |
— |
Private |
13-Jan-19 |
Excavation the soil from the bore hole |
Two new water reservior, replacement the pump, submersible, construction of two rooms for the generator, new generator, solar, battery solar, new pipeline, assembling the branch with water tank, rehabilitation of piplilines, water kiosks and the training for the employees |
— |
— |
7904 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
2022-03-31 |
Sool |
las_caanood |
Qoriley |
1.0 |
Turkey |
31/03/2020 |
Qoriley BH |
— |
8.0165704 |
47.5668874 |
698.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
5600 |
5000 |
300 |
8000 |
0.0 |
— |
460.0 |
pvc |
8.0 |
— |
33.0 |
15.0 |
— |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
Galvanised Steel |
40.0 |
0 |
1 |
3 |
yes |
5 |
18.0 |
Submersible Pump |
— |
15.0 |
440.0 |
Hybrid - Solar/Generator |
Parkins |
60.0 |
— |
— |
good |
— |
yes |
Colorless and odorless |
31.8 |
7.9 |
2520.0 |
1688.0 |
— |
Communal |
yes |
31/03/2020 |
6 |
1 |
no |
— |
no |
— |
— |
— |
— |
— |
— |
1. Rehabilitation of pump and riser pipes.
2. Construction of new koisks.
3. Extension pipelines.
4. Fancing of borehole.
|
— |
— |
8657 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
2022-03-31 |
Togdheer |
buuhoodle |
Xamar lagu xir |
1.0 |
UNICEF |
28/03/2022 |
Xamar lagu xir BH |
— |
8.1448754 |
46.5993502 |
609.0 |
— |
1 |
— |
— |
yes |
— |
No |
It is new borehole, and water system under construction |
— |
— |
— |
— |
— |
— |
360.0 |
pvc |
8.0 |
239.0 |
15.0 |
— |
— |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
no |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
1. Installation of solar power
2. Fencing of borehole |
— |
— |
7035 |
— |
Dug Well |
FGS Ministry of Energy and Water Resources |
2022-03-31 |
Lower Juba |
kismayo |
Dalhiska-Farjano Kismayo |
12.0 |
Private |
28/01/2005 |
DALHISKA SHALLOW WELLS |
— |
-0.3403629 |
42.5688215 |
-32.0 |
— |
— |
— |
rural urban |
yes |
— |
Yes |
— |
3000 |
60 |
200 |
120 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
17.0 |
16.0 |
25.0 |
12.0 |
16.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Other |
0.0 |
— |
80.0 |
2500 |
0 |
0 |
yes |
5 |
25.0 |
No Pump |
— |
— |
— |
— |
— |
— |
— |
— |
good |
No proper piping system, water wasted during water trucking returns back shallow well, no chlorination us done |
no |
— |
— |
— |
— |
— |
— |
Private/Individual |
— |
— |
— |
— |
yes |
3.0 |
yes |
— |
— |
— |
— |
— |
No |
Need hand pump but owner says if you fix with hand pump water yield becames low same case chlorination |
— |
— |
7133 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
2022-03-31 |
Sool |
las_caanood |
Saaxdheer |
0.5 |
NPA |
31/03/2014 |
Seexdheer BH |
— |
8.0068294 |
47.1040015 |
608.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
17500 |
5000 |
300 |
15000 |
0.0 |
— |
370.0 |
pvc |
8.0 |
— |
12.0 |
12.0 |
— |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
76.0 |
PVC |
1200.0 |
25 |
5 |
5 |
yes |
40 |
8.0 |
Submersible Pump |
Lowara |
15.0 |
330.0 |
Hybrid - Solar/Generator |
Parkins |
45.0 |
BR-M300W |
21.0 |
good |
— |
yes |
Colorless and odorless |
31.6 |
7.76 |
1912.0 |
1281.0 |
— |
Communal |
yes |
31/03/2018 |
3 |
0 |
yes |
0.05 |
yes |
— |
— |
— |
CARE Somalia |
30/12/2021 |
1. Construction of new elevated tank
2. Rehabilitation of pump and riser pipes
3. Construction of 2 koisks
4. Installation of new generator |
1. Extra generator. |
— |
— |
8412 |
— |
Dug Well |
FGS Ministry of Energy and Water Resources |
2022-03-31 |
Lower Juba |
kismayo |
DALKISKA-Camp Biyole Farjano-Kismayo |
12.0 |
Private |
28/12/2019 |
Dalhiska shallow wells |
— |
-0.3409301 |
42.5685426 |
-25.0 |
— |
— |
— |
rural urban |
yes |
— |
No |
17 |
4200 |
0 |
0 |
0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
14.0 |
9.0 |
2.0 |
8.0 |
13.0 |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
60.0 |
PVC |
10.0 |
4200 |
2 |
0 |
no |
— |
— |
Submersible Pump |
Long pump |
1.0 |
— |
Solar |
— |
— |
— |
200.0 |
poor |
Currently not functioning and HHs used recently dug well with protection next to unused shallow well done private person |
no |
— |
— |
— |
— |
— |
— |
Communal |
yes |
26-Jan-20 |
7 |
3 |
no |
— |
no |
— |
— |
— |
Agency not specified |
— |
No any intervention had been done and several times had informed ministry of water and many organisation but none had came back even for update added fear also you do same like those be4 you |
Needs to made functional and to come someone expert to see problem but if i say the problem of the shallow well not rehab since constructed, pump have issue, solar small, tank links when full, |
— |
— |