SWIMS Database :: CCP MoECC
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8041 Borehole Somaliland MoWRD 2022-03-30 Togdheer buuhoodle Ceegaag 1.0 UNICEF 14/10/2011 Ceegaag Borehole 8.61694929655641 46.4946011267602 792.0 0 rural yes Yes 300 500 0 500 0.0 350.0 pvc 8.0 312.0 15.0 6.0 Concrete/Masonry tank 14.0 PVC 1200.0 900 5 4 yes 5 8.0 Submersible Pump Groundfors 40.0 213.0 Hybrid - Solar/Generator JP45 45.0 Photovoltaic Module 300.0 good no 34.0 7.1 1450.0 2600.0 Communal yes 23/11/2018 5 3 no no No interventions carried out recently Fence, change cable, change of pump, increase number of animal throughs.
8414 Dug Well FGS Ministry of Energy and Water Resources 2022-03-30 Bakool waajid Waaberi 0.0 Action Afrika Hilfe e.V 03/11/2008 Jaamac well 3.80793 43.2498862 347.0 18 urban yes Yes 96 11.0 1.0 1.0 12.0 0.5 1.0 Other 0.5 Other 11.0 16 0 0 no Hand Pump Ajay 1.0 good In good condition no Private/Individual no no GRRN 25-Feb-20 Rehabilitation and Installation of hand pump Animal troughs
7767 Borehole Galmudug Ministry of Energy and Water Resources 2022-03-30 Galgaduud cabudwaaq Balanballe 2.0 Ceel soolar 30/03/2019 Ceel soolar 5.7671151 45.742226 374.0 0 urban rural yes Yes 7500 200 41000 135.0 pvc 8.0 18.0 Concrete/Masonry tank 120.0 Galvanised Steel 190.0 2500 2 3 yes 11 10.0 Submersible Pump franglin 96.0 Hybrid - Solar/Generator Doutz 42.0 340W 18.0 no 31.6 7.08 2202.0 1079.0 Communal yes 0.001
8371 Dug Well FGS Ministry of Energy and Water Resources 2022-03-30 Hiraan bulo_barde Bag abeeyso 2.0 Community 30/03/2019 Ilka case water supply 3.8466431 45.5690095 112.0 2 urban yes Yes 12000 15.0 5.0 10.0 12.0 6.0 1.0 Concrete/Masonry tank 30.0 PVC 1500.0 1714 2 2 yes 10 25.0 Submersible Pump Submersible pump 5.0 8.0 Generator Changfa 15.0 good This water is good no Private/Individual no no Community 26-Nov-17 Rehabilitation Rehabilitation, solar system
8439 Dug Well FGS Ministry of Energy and Water Resources 2022-03-30 Bakool waajid Koonfur Galbeed 0.1 Former Somali Government 03/10/1971 Eleenjeedo well 3.8073935 43.2458198 347.0 65 urban yes Yes 600 7.0 3.0 4.0 24.0 2.0 0.2 Other 0.5 Other 0.0 100 0 8 yes 10 10.0 No Pump fair Open and unprotected no Communal no no no GREDO 19-Aug-14 Rehabilitation of the animal troughs Submersible tank
8532 Dug Well FGS Ministry of Energy and Water Resources 2022-03-30 Bakool waajid Wadajir 0.2 Private 25/08/2008 Farow well 3.8124522 43.2410008 357.0 25 urban no 8 Yes 60 12.0 1.0 0.5 12.0 2.0 2.0 Other 0.5 Other 0.0 10 0 0 no No Pump fair Open and unprotected no Private/Individual no no Agency not specified No internvention was done Rehabilitation
7886 Borehole Puntland Ministry of Energy Minerals and Water 2022-03-30 Sool las_caanood Hadhwanaag 0.9 UNICEF 30/03/2018 HadhwanaagBH 8.5322608 48.1698912 492.0 1 urban rural yes Yes 1750 800 5000 2.0 80.0 pvc 8.0 24.0 28.5 14.0 4.5 0.2 Concrete/Masonry tank 25.0 PVC 900.0 0 4 2 yes 15 8.0 Submersible Pump Lowara 11.0 65.0 Hybrid - Solar/Generator Parkins 20.0 BYD400-MIK-36 8.0 good yes Colorless and odorless 33.8 7.38 2670.0 1330.0 Communal yes 30/03/2018 7 no no KAALO Relief and Development 30/12/2021 2. Installation of solar power 1. Rehabilitation of koisks 2. Operator supporting 3. Fencing borehole area
8236 Borehole Somaliland MoWRD 2022-03-30 Togdheer buuhoodle Buhoodle 2.0 UNICEF 21/03/2010 Faarah Bullay Borehole 1 8.21982813533396 46.3559054397047 641.0 1 rural urban yes Abandoned 0 0 300 4000 0.0 360.0 pvc 8.0 0.0 0.0 Concrete/Masonry tank 30.0 Other 0 9 6 no Submersible Pump Laura 0.0 330.0 Generator 0 0.0 poor The supply system of the borehole is not functioning and the borehole is abandoned the casing is damaged and leaked due to excessive salts of the borehole. no 0.0 Communal no no no After the borehole is left and abandoned no agency carried out intervention in this borehole. currently the borehole needs rehabilitation, casing change, rehabilitation of the reservoirs
7729 Dug Well FGS Ministry of Energy and Water Resources 2022-03-30 Lower Shabelle afgooye Damaleey 1.0 Private 29/11/2004 Towfiiq water supply 2.1418269 45.1153118 63.0 2 rural yes Yes 1600 0 0 0 0.0 22.0 2.0 2.0 24.0 2.0 2.0 Plastic tank 7.0 PVC 1000.0 400 1 0 no Submersible Pump 2.5 Italian 2.5 1.0 Electricity Grid poor After starting the work every thing was going good but after 2 years there was poor supply system yes Good 0.0 Private/Individual yes 0.01 no Private 18-Feb-22 Remove the soil from the well and replace the old pipeline Increase the depth of the well, rehabilitation of old well and increase the 3 Wells, provide additional pipeline, receive generator or solar system
7728 Dug Well FGS Ministry of Energy and Water Resources 2022-03-30 Lower Shabelle afgooye Waanjeele 3.0 Private 13/01/1998 AL NAJAX WATER SUPPLY 2.1514949 45.1228462 41.0 5 rural yes Yes 3500 0 0 0 1.0 20.0 6.0 10.0 19.0 2.0 1.0 Concrete/Masonry tank 36.0 PVC 1200.0 700 3 0 yes 2 10.0 Submersible Pump 4.5 KW 10.0 2.0 Generator Gancava China 125 25.0 poor In January, February, March and first 15 days of April there is a gab for our supply system yes Good 0.0 Communal yes 19-Nov-10 4 2 yes 0.01 no Zam zam foundation 18-Mar-08 Provision of new dug well, distribution of Chlorine Provision of two borehole , rehabilitation of reservior, provide of solar system, distribution of pipeline, provide pump and sumersible. Distribution of chlorine while january, february, march and april