7826 |
— |
Dug Well |
Galmudug Ministry of Energy and Water Resources |
2022-03-24 |
Galgaduud |
cadaado |
Gidheys |
0.0 |
Community |
— |
Abdi-sw |
— |
6.01813 |
46.6820733 |
300.0 |
— |
1 |
— |
urban |
yes |
— |
Yes |
— |
15 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
20.0 |
7.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
Galvanised Steel |
25.0 |
1 |
0 |
0 |
— |
— |
— |
Submersible Pump |
Not specified |
— |
18.0 |
Solar |
— |
— |
— |
— |
poor |
Not have irrigation distribution pipes for farm proposed this source and require supply for irrigation for 0.5 Hectare farm. |
no |
— |
35.0 |
7.03 |
3800.0 |
1900.0 |
— |
Private/Individual |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
CPD |
Tank |
— |
2015-11-23 |
— |
— |
8396 |
— |
Dug Well |
FGS Ministry of Energy and Water Resources |
2022-03-23 |
Hiraan |
beled_weyne |
Garas gaab |
4.0 |
Community |
18/02/2020 |
Garasgaab |
— |
4.7619419 |
45.187969 |
150.0 |
— |
2 |
— |
urban |
yes |
— |
Yes |
— |
1000 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
12.0 |
10.0 |
8.0 |
12.0 |
2.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Steel tank |
5.0 |
PVC |
20.0 |
142 |
1 |
1 |
no |
— |
— |
Hand Pump |
Dynamos |
12.0 |
— |
— |
— |
— |
— |
— |
good |
Need solar |
no |
— |
— |
— |
— |
— |
— |
Private/Individual |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
Community |
21-Feb-21 |
Rehabilitation |
Solar system |
— |
— |
8403 |
— |
Dug Well |
FGS Ministry of Energy and Water Resources |
2022-03-23 |
Hiraan |
beled_weyne |
Buulokahin |
20.0 |
CESVI |
22/08/2019 |
Bulokahin water center |
— |
4.7966857 |
45.18858 |
159.0 |
— |
6 |
— |
rural urban |
yes |
— |
Yes |
— |
1400 |
0 |
0 |
1500 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
13.0 |
5.0 |
10.0 |
12.0 |
6.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
15.0 |
PVC |
300.0 |
200 |
2 |
2 |
no |
— |
— |
Hand Pump |
Dynamos |
5.0 |
— |
— |
— |
— |
— |
— |
poor |
Dynamos stoped |
no |
— |
— |
— |
— |
— |
— |
Utility/Local Authority |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
CESVI |
23-Dec-20 |
Elevator water tank and solar system |
Rehabilitation, pipeline size 80 in meter 10, dynamos, generator |
— |
— |
8402 |
— |
Dug Well |
FGS Ministry of Energy and Water Resources |
2022-03-23 |
Hiraan |
beled_weyne |
Sigaaloow makane |
3.5 |
CESVI |
25/10/2020 |
Sigalow water supply |
— |
4.7604082 |
45.1887175 |
152.0 |
— |
5 |
— |
urban |
yes |
— |
Yes |
— |
400 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
10.0 |
6.0 |
5.0 |
12.0 |
4.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Other |
5.0 |
PVC |
10.0 |
57 |
0 |
0 |
no |
— |
— |
Hand Pump |
Dynamos |
5.0 |
— |
— |
— |
— |
— |
— |
good |
Ok |
no |
— |
— |
— |
— |
— |
— |
Utility/Local Authority |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
CESVI |
21-Feb-21 |
Solar system |
— |
— |
— |
8398 |
— |
Dug Well |
FGS Ministry of Energy and Water Resources |
2022-03-23 |
Hiraan |
beled_weyne |
Shiimo |
7.0 |
CESVI |
20/11/2019 |
Shimo water community |
— |
4.733271 |
45.1815352 |
151.0 |
— |
3 |
— |
urban rural |
no |
9 |
No |
Lack of generator |
5000 |
0 |
0 |
0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
15.0 |
10.0 |
10.0 |
12.0 |
6.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
15.0 |
PVC |
100.0 |
715 |
2 |
0 |
no |
— |
— |
Surface mounted Pump |
Dynamos |
8.0 |
— |
Generator |
Changfa |
12.0 |
— |
— |
poor |
Lack of water and generator |
no |
— |
— |
— |
— |
— |
— |
Private-Public-Partnership |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
CESVI |
22-Nov-20 |
Rehabilitation |
Rehabilitation generator and dynamos |
— |
— |
8405 |
— |
Dug Well |
FGS Ministry of Energy and Water Resources |
2022-03-23 |
Hiraan |
beled_weyne |
Buulotimiro |
5.0 |
Community |
19/11/2005 |
Timiro |
— |
4.7225178 |
45.1927405 |
154.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
4025 |
0 |
208 |
1500 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
9.0 |
2.0 |
8.0 |
12.0 |
3.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
35.0 |
PVC |
300.0 |
575 |
2 |
1 |
no |
— |
— |
Hand Pump |
— |
5.0 |
— |
— |
— |
— |
— |
— |
good |
Ok |
no |
— |
— |
— |
— |
— |
— |
Private/Individual |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
Community |
23-Mar-20 |
Rehabilitation |
Solar system |
— |
— |
8381 |
— |
Borehole |
FGS Ministry of Energy and Water Resources |
2022-03-23 |
Gedo |
luuq |
Minyara |
19.0 |
SWALIM |
27/09/2016 |
Montara well |
— |
3.8039745 |
42.5500089 |
129.0 |
— |
2 |
— |
rural |
yes |
— |
Yes |
— |
2000 |
20 |
1500 |
1900 |
0.0 |
— |
8.0 |
gi |
2.0 |
3.0 |
2.0 |
12.0 |
1.0 |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
40.0 |
Galvanised Steel |
0.0 |
0 |
0 |
3 |
no |
— |
— |
Submersible Pump |
Electronic pump |
1.3 |
4.0 |
Generator |
110 |
1.6 |
— |
— |
fair |
No water supply system in place |
yes |
— |
— |
— |
— |
— |
— |
Communal |
yes |
21-Apr-17 |
5 |
2 |
no |
— |
no |
— |
— |
— |
World Vision |
22-Sep-17 |
Rehabilitation of animal troughs |
Rehabilitation of animal water troughs |
— |
— |
8387 |
— |
Borehole |
FGS Ministry of Energy and Water Resources |
2022-03-23 |
Gedo |
luuq |
Heloshiid |
29.0 |
NCA |
26/02/2015 |
Heloshiid community well |
— |
3.8031783 |
42.5507366 |
110.0 |
— |
2 |
— |
rural |
yes |
— |
Yes |
— |
8000 |
500 |
1000 |
10800 |
0.0 |
— |
15.0 |
pvc |
1.0 |
5.0 |
2.0 |
12.0 |
9.0 |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
30.0 |
PVC |
0.0 |
0 |
0 |
2 |
no |
— |
— |
Submersible Pump |
— |
0.0 |
2.0 |
Solar |
— |
— |
— |
0.0 |
fair |
No supply system in place |
yes |
— |
— |
— |
— |
— |
— |
Communal |
yes |
17-Mar-16 |
4 |
2 |
no |
— |
no |
— |
— |
— |
AGROSPHERE |
27-Mar-22 |
— |
— |
— |
— |
7768 |
— |
Spring |
Puntland Ministry of Energy Minerals and Water |
2022-03-23 |
Bari |
iskushuban |
Ufeyn |
18.0 |
Former Somali Government |
01/01/1950 |
Ufeyn Spring |
— |
10.7305293 |
49.8045026 |
570.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
24000 |
4000 |
— |
9000 |
15.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
80.0 |
— |
— |
— |
— |
Concrete/Masonry tank |
320.0 |
PVC |
— |
— |
1 |
1 |
yes |
20 |
8.0 |
No Pump |
— |
— |
— |
— |
— |
— |
— |
— |
fair |
1.Pipe lines are rusted
2. Water Tanks are leaking
3.there is no enough kiosks and troughs. |
no |
— |
28.1 |
7.6 |
815.0 |
406.0 |
— |
Communal |
yes |
20/01/2008 |
13 |
3 |
yes |
0.001 |
no |
— |
— |
— |
Puntland MoEMW |
01/06/2020 |
1. Rehabilitation of water tank |
1. 4km GI 3inch Pipes,14km 6inch PVC pipes and central Storage.
2. Large water Storage Tanks
3. Flooding protection mechanism for Pipelines
4.the town needs Pipeline system connected to each house hold.
5. Outside the town Troughs for animal.
6.specefic water tank for irrigation.
7. Warehouse for the accessories Storage. |
— |
— |
8536 |
— |
Borehole |
FGS Ministry of Energy and Water Resources |
2022-03-23 |
Gedo |
luuq |
Tuulo Afmadobe |
30.0 |
NCA |
26/01/2017 |
Afmadobe well |
— |
3.8031565 |
42.5506934 |
138.0 |
— |
2 |
— |
rural |
yes |
— |
Yes |
— |
1405 |
50 |
10000 |
100054 |
0.0 |
— |
10.0 |
pvc |
8.0 |
4.0 |
10.0 |
24.0 |
9.0 |
4.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
35.0 |
PVC |
0.0 |
0 |
0 |
2 |
no |
— |
— |
Surface mounted Pump |
— |
— |
— |
Generator |
115 |
12.0 |
— |
— |
poor |
No supply |
yes |
— |
— |
— |
— |
— |
— |
Communal |
yes |
27-Mar-17 |
5 |
2 |
no |
— |
no |
— |
— |
— |
ADRA |
24-Dec-17 |
Renovation |
Rehabilitation |
— |
— |