SWIMS Database :: CCP MoECC
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7649 Borehole Puntland Ministry of Energy Minerals and Water 2022-02-23 Bari qardho Qardo IDPs 1.5 Save the children 23/01/2020 Qardo IDPs borehole 9.4831712 49.0737678 709.0 9 rural urban yes Yes 12000 800 1500 1.0 240.0 pvc 8.0 170.0 12.0 15.0 Concrete/Masonry tank 50.0 PVC 5 9 yes 7 8.0 Submersible Pump Lowara 198.0 Hybrid - Solar/Generator Oelmo 50.0 SLA300M 21.6 no 32.4 7.0 2300.0 1172.0 Communal yes 22/09/2020 9 3 yes 0.02 Community_e 23/01/2022 1: Replacement some of main raising pipes. 2: Replacement of submersible pump 3: Replacement of electric cable. 1: Replacement of main raising pipes. 2: Construction of animal water troughs. 3: Construction of another elevated water tank due to population. 4: Construction of fencing which protect borehole to floods.
7058 Borehole Puntland Ministry of Energy Minerals and Water 2022-02-23 Bari qardho Xingood 0.3 UNICEF 23/11/2006 Xingood borehole 9.4977672 49.0827074 702.0 9 rural urban yes Yes 6000 800 2000 286.0 pvc 8.0 180.0 8.0 20.0 Concrete/Masonry tank 16.0 Galvanised Steel 1000 1 2 yes 10 10.0 Submersible Pump Lawara 220.0 Hybrid - Solar/Generator Perkins 65.0 DS572340M 27.8 good This borehole supply water to qardho city, we are not able to determine exact pipe line length. no 25.0 7.5 1400.0 700.0 Private-Public-Partnership yes 0.026 yes IOM 03/06/2020 Replacement of main raising pipes. Supplied of generator and submersible pump. Replecement of main raising pipes and submersible pump. Construction of wall fencing.
7059 Borehole Puntland Ministry of Energy Minerals and Water 2022-02-23 Bari qardho Aada 2.0 NRC 23/03/2020 Aada 1 9.4871156 49.0677047 700.0 9 rural urban yes Yes 3000 500 4000 230.0 pvc 8.0 120.0 11.0 20.0 Concrete/Masonry tank Galvanised Steel 500 1 2 yes 10 9.0 Submersible Pump Lawara 180.0 Hybrid - Solar/Generator Perkin 45.0 SZYL-M330-36 25.7 good This borehole gives water to the qardho city, so we can not determine exactly number of pipe lines This borehole and four other boreholes distribute water to the one elevated water tank which has a volume of 150 meter cubic no 28.0 6.7 1250.0 630.0 Private-Public-Partnership yes 0.026 yes DRC - Puntland 03/08/2020 Replacement of main raising pipes and submersible pump Supplied if generator. Replacement of main raising pipes and submersible pump Replacement of electric cable which connect generator and pump.
7232 Borehole Puntland Ministry of Energy Minerals and Water 2022-02-23 Bari qardho Shinbiraale 0.2 NRC 23/12/2013 Kuleejo borehole 9.5053611 49.0920081 710.0 9 rural urban yes Yes 13200 1000 2500 0.5 350.0 pvc 8.0 15.0 20.0 Concrete/Masonry tank 16.0 Galvanised Steel 50.0 2200 1 3 yes 11 50.0 Submersible Pump Lawara Hybrid - Solar/Generator Perkins 55.0 good no 29.0 6.8 2710.0 1320.0 Private/Individual yes 0.013 yes IOM 29/05/2020 Construction of elevated water tank which holds 150M3 Solar power installation Replacement of main raising pipes.
7176 Spring Puntland Ministry of Energy Minerals and Water 2022-02-22 Nugaal eyl Ceelmadoobe 0.8 Community 22/02/2011 Ceelmadoobe Spring 8.3965987 50.0466206 240.0 0 rural urban yes Yes 650 300 10000 0.0 20.0 Concrete/Masonry tank 16.0 Galvanised Steel 522.0 130 2 2 yes 2 5.0 Submersible Pump Lowara 5.0 3.0 Hybrid - Solar/Generator Lister petter 25.0 7.5 fair Supply Needs rehabilitation yes Colorless and odorless 29.0 7.1 3200.0 1650.0 Communal yes 22/01/2015 3 2 yes 0.05 yes Muslim Aid 22/01/2013 1.Construction of caretaker room. 2.Construction of elevated tank, kiosks, and animal thoughts. 1. Fancing of borehole 2. Week capacity of pump. 4. Construction of new kiosks 5.Rehiniltatation and Water supply extensions. 6. Rehabilitation of animal thoughts. 7. Rehabilitation of solar power system.
8673 Borehole Puntland Ministry of Energy Minerals and Water 2022-02-22 Bari qardho Yakayaka 3.0 UNICEF 28/12/2021 Yakayaka borehole 9.2174467 49.1000864 720.0 1 yes No 29/Dec/2021 New borehole No accessories such as storage tank, pipe lines, animal troughs. 400.0 pvc 8.0 168.0 10.0 The piplines are Not yet installed Water tank is still under construction yes Yellowish color and there is odor that smells like rotten egg. Communal no 1. The to be investigated and determined if its suitable for human consumption.
7439 Dug Well Puntland Ministry of Energy Minerals and Water 2022-02-22 Nugaal eyl Ciyocaddo 0.3 KAALO Relief and Development 22/01/2017 Ciyocado DW 8.2704521 49.8270006 61.0 0 rural urban yes Yes 7000 2000 5000 0.0 6.0 2.5 12.0 2.0 Concrete/Masonry tank 45.0 Galvanised Steel 500.0 500 4 3 yes 12 72.0 Submersible Pump Lowara 1.4 4.0 Hybrid - Solar/Generator Kama 0.22 300-72M 5.0 poor Destroyed dug well no 30.1 7.1 1000.0 495.0 Communal yes 22/01/2017 3 2 yes 0.1 KAALO Relief and Development 22/01/2018 Construction of ground tank 1. Drilling new dug well. 2. Rehabilitation of water supply extension. 3. Construction of new kiosks. 4. Construction of new elevated tank
7084 Spring Puntland Ministry of Energy Minerals and Water 2022-02-22 Nugaal eyl Mareye 3.0 CARE Somalia 24/02/2011 Mereye spring 8.3303933 50.1705172 -46.0 1 urban rural yes Yes 5250 1000 50 10000 0.0 16.0 Concrete/Masonry tank 54.0 Galvanised Steel 5000.0 750 6 4 yes 5 30.0 Submersible Pump Lowara 7.5 3.0 Hybrid - Solar/Generator COELMO 30.0 HSPH11KH 11.0 fair Pipelines needs rehabilitation yes Colorless and odorless 29.5 7.73 1875.0 943.0 Communal yes 22/01/2011 2 3 yes 0.1 yes Action Afrika Hilfe e.V 25/12/2021 Construction of elevated water tank 1.Pipelines rehabilitation water supply. 2. Rehabilitation of pump and installation new pump. 3. Reconstruction/ rehabilitation of spring well. 4. Construction of new kiosks. 6. Extension of pipelines water supply in village.
7348 Borehole Puntland Ministry of Energy Minerals and Water 2022-02-22 Bari qardho Xaajikhayr 1.0 UNICEF 22/12/2021 Xaajikhayr borehole 8.989235 49.2686459 620.0 1 rural urban yes Yes 18000 7000 45000 0.25 312.0 pvc 8.0 102.0 16.0 15.0 Concrete/Masonry tank 50.0 Galvanised Steel 1200.0 3000 1 2 yes 10 45.0 Submersible Pump Lawara 294.0 Hybrid - Solar/Generator Coelmo 50.0 Dusol 26.5 good no 26.0 7.0 4050.0 1950.0 Communal no yes yes KAALO Relief and Development 22/12/2021 Solar power installation Water supply system of the whole village Construction of extra water kiosks 1000 meter of pipe line of the whole the village. Water purification.
7970 Dug Well Puntland Ministry of Energy Minerals and Water 2022-02-21 Bari qardho Yibaayil 0.5 Community 20/02/1900 Yibaayil dug well 8.9940942 48.8926948 632.0 3 rural urban yes Yes 30000 27000 150000 3.0 2.0 2.5 12.0 1.0 Concrete/Masonry tank 20.0 Galvanised Steel 600.0 5000 3 yes 17 10.0 Submersible Pump 3.0 Solar Dusol-160W 1.6 poor There is no generator. There is a problem of solar power system. There is no good main raising pipes There is no main distribution pipe lines. no 31.0 6.8 2000.0 1000.0 Communal yes 14/02/2008 5 2 no no Community 01/09/2021 Digged new well New pipelines Concrete top Cover of the well Pump, solar. New well to be digged Powerful solar system Bigger capacity water tank Extended pipeline and to be renewed Rehabilitation of the solar system Kiosks to be rehabilitated and New kiosks. Curent water tank needs immediately Rehabilitation.